TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 100 AMP
GENERATOR SYSTEM (M577A2 ONLY)
DESCRIPTION
This task covers:
Remove (page 12-28).
Install (page 12-30),
INITIAL SETUP
Tools:
References:
General Mechanics Tool Kit (Item 30, App D)
See your -10
Materials/Parts:
Sealing compound
Gasket
Grommet (9)
Lockwasher (5)
Lockwasher (5)
Equipment Conditions:
(Item 52, App C)
Engine stopped (see your 10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2)
Master switch panel assembly removed
(page 922)
Personnel Required:
Unit Mechanic
REMOVE
3.
1.
2.
Remove screw (1), lockwasher (2), and circuit
415 lead (3) from bus bar (4). Remove circuit
415 lead and grommet (5) from distribution
box (6). Discard grommet and lockwasher.
Remove screw (7), lockwasher (8), circuit 6
4
lead (9), and circuit 49 lead ( 10) from bus
bar (4). Remove circuit 6 lead, circuit 49
lead, and two grommets (11 and 12) from
distribution
lockwasher.
box (6).
Remove screw ( 13), lockwasher ( 14), circuit
10, 14, 15, 27E lead (15), and circuit 450A
lead (16 ) from bus bar (4). Remove circuit
10, 14, 15, 27E lead and grommet (17) from
distribution box (6). Discard grommet and
Iockwasher.
Remove screw ( 18), lockwasher ( 19), and
wiring harness (20) from bus bar (4). Discard
lockwasher.
12-28