TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 200 AMP
GENERATOR SYSTEM (M577A2 AND M1068 ONLY)
DESCRIPTION
This task covers:
Remove (page 12-23).
Install (page 12-25).
INITIAL SETUP
Tools:
References.
General Mechanics Tool Kit (Item 30, App D)
see your -10
Materials/Parts:
Equipment Conditions:
Sealing compound (Item 52, App C)
Engine stopped (see yOUr -10)
Gasket
Carrier blocked (see your -10)
Grommet (9)
Battery ground lead disconnected (page 13-2)
Lockwasher (5)
Master switch panel assembly removed
Lockwasher (5)
(page 9-22)
Personnel Required:
Unit Mechanic
REMOVE
3.
1.
2.
Remove screw (1), lockwasher (2), and circuit
415 lead (3) from bus bar (4). Remove circuit
415 lead and grommet (5) from distribution
box (6). Discard grommet and lockwasher.
Remove screw (7), lockwasher (8), circuit 6
4.
lead (9), and circuit 49 lead (10) from bus
bar (4). Remove circuit 6 lead. circuit 49
Remove screw (13), lockwasher (14), circuit
10, 14, 15, 27E lead (15), and circuit 450A
lead (16) from bus bar (4). Remove circuit
10, 14, 15, 27E lead and grommet (17) from
distribution box (6).
lockwasher.
Remove screw (18),
wiring harness (20)
lockwasher.
Discard grommet and
lockwasher (19), and
from bus bar (4). Discard
,
GO TO NEXT PAGE
Change 3
12-23