TM 9-2350-261-20-1
R E P L A C E A I R B O X H E A T ER
DESCRIPTION
This task covers:
Remove (page 6-138).
Install (page 6139).
INITIAL SETUP
Tools:
General Mechanics
Materials/Parts:
References:
Tool Kit (Item 30, App D)
See your -10
Equipment Conditions:
Sealing compound (Item 46, App C)
Engine stopped/shutdown (see your -10)
Gasket
Battery ground lead disconnected (page 13-2)
Preformed packing
Carrier blocked (see your -10)
Air box heater solenoid valve removed
Personnel Required:
(page 6-136)
Unit Mechanic
Trim vane lowered and power plant front
access door open (see your -10)
REMOVE
4.
1. Disconnect lead (1) from igniter (2).
2. Disconnect air hose (3) from elbow (4).
5.
3. Remove elbow (4) from adapter (5).
6.
Remove three screws (6) and washers (7) .
that secure air box heater body (8) to engine.
Three leads (9) will come off with one
screw (6).
Remove heater body (8), packing (10), and
gasket (11) from engine. Discard packing and
gasket.
Remove elbow (12), spray nozzle (13), and
adapter (5) from heater body (8).
6-138