TM 9-2350-261-20-1R E P L A C E A I R B O X H E A T E R A I R P U M PDESCRIPTIONThis task covers:Remove (page 6-133).Install (page 6-134).I N I T I A L S E T U PTools:References:General Mechanics Tool Kit (Item 30, App D)see your -10Materials/Parts:Equipment Conditions:sealing compound (Item 46, App C)Engine stoppedshutdown (see your –10)Carrier blocked (see your -10)Personnel Required:Ramp lowered (see your -10)Unit MechanicBattery ground lead disconnected (page 13-2)Trim vane lowered and power plant frontaccess door open (see your -10)R E M O V E1. Remove two nuts (1), washers (2), and leads(3 and 4) from air box heater air pump (5).2. Remove adapter (6) from elbow (7).3. Remove adapter (8) from elbow (9).4. Remove screw (10), washer (11)) retainer(12), air pump (5), and pad from mount (13).5. Remove elbow (7) from air pump (5).6. Remove elbow (9) from air pump (5).GO TO NEXT PAGE6-133
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business