TM 9-2350-261-20-1
INSTALL
7.
8.
9.
Secure three ground leads (1) to air box
er (2) with washer (3) and screw (4).
Connect wiring harness connector (5) to
control solenoid (6).
10.
heat-
11.
fuel
12.
Secure two wiring harness leads (7) to air
pump (8) with two washers (9) and
nuts (10).
13.
Connect wiring harness connector (11) to
coil (12).
Connect air box heater wiring harness con-
nector (13) to power plant wiring harness
receptacle (14).
Secure air box heater wiring harness (15) to
air box heater hose with strap (16).
Use sealing tape (17) to secure air box heat-
er wiring harness (15) to air box heater
hose (18).
FOLLOW-THROUGH STEPS
1. Close power plant front access door and raise
2. Connect battery ground lead (page 13-2).
trim vane (see your -10).
END OF TASK
6-141 (6-142 blank)