TM 9-2350-261-20-1
INSTALL
7.
8.
9.
Apply sealing compound to cleaned external
threads of fittings.
Install elbows (1 and 2) in air pump (3).
Install air pump (3) and
Secure with retainer (5),
screw (7).
-
pad on mount (4).
10. Install adapters (8 and 9) on elbows
(1 and 2).
11. Secure leads (10 and 11) to air pump (3)
with two washers (12) and nuts (13).
washer (6), and
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
2. Close power plant front access door and raise
trim vane (see your -10).
END OF TASK
6-134
I