TM 9-2350-261-20-1
FOLLOW-THROUGH STEPS
1. Install generator mounting bracket (100 amp
4. Connect battery ground lead (page 13-2).
only) (page 9-31) or 200 amp only)
(page 9-34).
5. Start engine. Check for leaks.
2. Install secondary fuel filter assembly
6. Raise and lock ramp (see your -10).
(page 6-125).
7. Stop/shutdown engine (see your -10).
3. Install primary fuel filter assembly
(page 6-123).
8. Install power plant rear access panel
(page 24-27 or 24-29).
END OF TASK
6-131