TM 9-2350-261-20-128. Install elbow (1) in filler neck (2).29. Connect return tube (3) to elbow (1).30. Connect return tube (3) to nipple (4) ortee (4.1) (M1068).31. Install return tube (3) on four weldnuts (5).Secure with four clamps (6), newlockwashers (7), and screws (8).FOLLOW-THROUGH STEPS1. Install muffler (page 7-20).6. Start engine (see your -10). Check returnhoses for leaks.2. Install personnel heater page 29-51).3. Install generator (page 9-31 and 9-34).4. Install electronic equipment heater(page 31-16).7. Install map board (see your -10).8. Install power plant rear access panel(page 24-29).5. Connect battery ground lead (page 13-2).9. Raise and lock ramp (see your -10).10. Engine stopped/shutdown (see your -10).END OF TASKChange 46-69
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business