TM 9-2350-261-20-1
46. Install shutoff valve (1) on nipple (2).
47. Install nipple (2) in tube (3).
49. Install leads (7), two elbows (5), and two
tubes (3 and 6) on four weldnuts (11).
Secure with four clamps (12), new
lockwashers (13), and screws (14).
48. Install four clamps (4) on two elbows (5)
and tubes (3 and 6). Secure four ground
leads (7) to clamps (4) with four screws (8),
new lockwashers (9), and locknuts (10).
50. Connect personnel heater fuel hose (15) to
shutoff valve (1), if not connected.
51. Fill fuel tank (see your -10).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Install rear compartment floor plates
(page 24-37).
2. Start engine (see your -10) check for leaks.
3. Install power plant rear access panel
(page 24-29).
5. Raise and lock ramp (see your -10).
6. Stop/shutdown engine (see your -10).
END OF TASK
6-65