TM 9-2350-287-20-18-2. SHIFT CONTROL LINKAGE REPAIR (continued).e. INSTALLATIONNOTEAll washers and cotter pins used in the installation of assembled rods may beinstalled after final adjustment of shift control linkage.1.Install lever (39) and throttle control lever (37) on transmission shaft (42) with screw (35) and washer (36).2.Install assembled rod (29) on lever (39) with pin (38), washer (40), and new cotter pin (41).3.Install spacer (31) and bellcrank (30) on transmission with screw (26), new lockwasher (27), and washer (28).4.Install assembled rod (29) on bellcrank (30) with screw (25) and new lockwasher (34). Torque screw between 15and 19 ft-lb (20 and 24 Nm).5. Install assembled rod (17) on bellcrank (30) with screw (33) and new lockwasher (32).Change 1 8-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business