TM 9-2350-287-20-18-2. SHIFT CONTROL LINKAGE REPAIR (continued).11.Install cover (54) and instruction plate (53) on shift quadrant (4) with two screws (50) and new lockwashers (49).12.Install three screws (47) and new lockwashers (48) on shift quadrant (4).13.Install handle (51) on shift quadrant (4) with new spring pin (52).NOTE·Step 13 covers assembly of all assembled rods (6, 14, 17, and 29). Assembledrod (17) is shown.·Step 14 covers further assembly of assembled rod (17) equipped with quick-release pin.14.Install two nuts (44) and bearings (43) on assembled rod (6, 14, 17, and 29). Do not tighten nuts until finaladjustment.15.Install quick-release pin (16), chain (46), and new wire (45) on bearing (43) of assembled rod (17).Change 1 8-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business