TM 9-2350-287-20-1
7-18.
NBC POWER CONTROL BOX REPAIR (continued).
NOTE
Connectors J1 and J2 are removed with soldered wires intact.
16.
Remove four screws (68), washers (65), lockwashers (64), and nuts (63), gasket (66), and connector J1 (67) from
control box (2). Discard gasket and lockwashers.
17.
Remove four screws (75), washers (70), lockwashers (71), and nuts (72), terminal lug (69), gasket (73), and
connector J2 (74) from control box (2). Discard gasket and lockwashers.
c.
INSPECTION
1.
Inspect all leads for cracked insulation and broken or missing terminal lugs. Replace any damaged or defective
leads.
2.
Inspect connectors J1 (67) and J2 (74) for cracks, damaged threads, and missing pins, sockets, or terminal lugs.
Replace any damaged components.
d.
ASSEMBLY
1.
Install connector J2 (74), new gasket (73), and terminal lug (69) on control box (2) with four screws (75), washers
(70), new lockwashers (71), and nuts (72).
2.
Install connector J1 (67) and new gasket (66) on control box (2) with four screws (68), washers (65), new
lockwashers (64), and nuts (72).
Change 1 7-55