TM 9-2350-287-20-17-18.NBC POWER CONTROL BOX REPAIR (continued).3.Install circuit breaker (15) on mounting plate (16) with two screws (59), washers (60), new lockwashers (61), andnuts (62).4.Install switch (52) and guard (51) on cover (8) and secure with nut (49) and washer (50).5.Install dust boot (48) on switch (52).6.Install two leads, 415-4 (13) and 415-7 (21), on switch (52) and secure with two screws (54) and lockwashers (53).NOTEPerform step 7 only if leads 415-5 or415-6 were removed from indicatorlight.7.Solder leads 415-5 (57) and 415-6 (58) toterminal on indicator light (47).8.Install indicator light (47) on cover (8) with nut(55) and washer (56).7-56
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business