TM 9-2350-287-20-1
7-18.
NBC POWER CONTROL BOX REPAIR (continued).
3.
Install circuit breaker (15) on mounting plate (16) with two screws (59), washers (60), new lockwashers (61), and
nuts (62).
4.
Install switch (52) and guard (51) on cover (8) and secure with nut (49) and washer (50).
5.
Install dust boot (48) on switch (52).
6.
Install two leads, 415-4 (13) and 415-7 (21), on switch (52) and secure with two screws (54) and lockwashers (53).
NOTE
Perform step 7 only if leads 415-5 or
415-6 were removed from indicator
light.
7.
Solder leads 415-5 (57) and 415-6 (58) to
terminal on indicator light (47).
8.
Install indicator light (47) on cover (8) with nut
(55) and washer (56).
7-56