Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-ON MAINTENANCE - TM-9-2350-287-20-1_745
FOLLOW-ON MAINTENANCE - TM-9-2350-287-20-1_747
TM-9-2350-287-20-1 Carrier Ammunition Tracked M992A21 (2350-01-352-3021) EIC:AE6 Manual
Page Navigation
713
714
715
716
717
718
719
720
721
722
723
TM 9-2350-287-20-1
7-17. CONVEYOR CONTROL SWITCH REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
l
General mechanic’s tool kit (Item 24,
l
Vehicle parked on level ground (refer to
Appendix I)
TM 9-2350-287-10).
l
MASTER switch set to OFF (refer to
Materials/Parts:
TM 9-2350-287-10).
l
Lockwasher (2) (Item 160, Appendix H)
l
Battery ground cables disconnected (para 7-41).
a.
1.
2.
3.
4.
b.
1.
2.
3.
4.
REMOVAL
Turn four retaining studs (4) on gage panel cover (9).
Pull gage panel cover (9) away from gage panel (5).
Disconnect electrical connector AAA (6), electrical connector 10 (7), and electrical connector AAB (8) from
conveyor control switch (10).
Remove two screws (2) and Iockwashers (1 ), switch (10), and guard (3) from gage panel cover (9). Discard
Iockwashers.
INSTALLATION
Install guard (3) and switch (10) on gage panel cover (9) with two new Iockwashers (1 ) and screws (2).
Connect electrical connector AAB (8), electrical connector 10 (7), and electrical connector AAA (6) to conveyor
control switch (10).
Position gage
panel cover (9) on gage panel (5)
0
Secure gage panel cover (9) to gage panel (5) with four retaining studs (4).
7-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business