Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-3_94
RERMOVAL
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
48
49
50
51
52
53
54
55
56
57
58
TM 9-2350-277-20-3
REPLACE NATO AUXILIARY POWER (SLAVE) RECEPTACLE (M577A3 AND
M1068A3 ONLY)
0264 00
THIS WORK PACKAGE COVERS:
Removal (page 0264 00-1).
Installation (page 0264 00-3).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Multimeter
(WP 0926 00, Item 30)
Materials/Parts
Gasket
Gasket
Lockwashers (4)
Lockwashers (4)
Lockwashers (7)
Lockwashers (2)
Personnel Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground lead disconnected (WP 0338 00)
REMOVAL
1.
Remove seven screws (1),
lockwashers
(2), washers (3), and harness protector (4) from hull. Discard lockwashers.
2.
Remove screw (5), washer (6), clamp (7), and circuit 50 lead (8) from hull weldnut.
3.
Remove four screws (9),
lockwashers
(10), and washers (11) from receptacle (12). Discard lockwashers.
0264 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business