TM 9-2350-277-20-3REPLACE NATO AUXILIARY POWER (SLAVE) RECEPTACLE (M577A3 AND M1068A3ONLY) — Continued0264 00INSTALLATION1. Install insulator bushing (1) in hull.2. Install receptacle (2), new gasket (3), insulator (4), adapter (5), and new gasket (6).3. Connect circuit 6 lead (7) to positive terminal of receptacle (2) with new lockwasher (8) and screw (9).4. Connect circuit 50 lead (10) to negative terminal of receptacle (2) with new lockwasher (11) and screw (12).5. Position new gasket (6) and adapter (5) on hull and secure with four screws (13), new lockwashers (14), andwashers (15).6. Align receptacle (2), new gasket (3), and insulator (4) with adapter (5). Install four screws (16), new lockwashers (17),and washers (18).7. Place circuit 50 lead (10) and clamp (19) on hull weldnut. Secure with washer (20) and screw (21).8. Position harness protector (22) and secure with seven screws (23) new lockwashers (24), and washers (25).FOLLOW-THROUGH STEPS1. Connect battery ground lead (WP 0338 00).END OF TASK0264 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business