CONVEYOR CHAIN ASSEMBLY: REMOVAL AND INSTALLATION
REMOVAL
A Loosen chain tension and break chain at master link (TM
9-2350-267-10).
B Remove chain (1) from conveyor by rotating conveyor manual
hand crank (2) until chain is free of drive sprockets.
INSTALLATION
A Adjust conveyor chain tension (TM 9-2350-267-10).
B Reverse removal procedures.
TM 9-2350-267-20
TA310219
12-19