FOLLOW-THROUGH STEPS
5.
1.
2.
3.
4.
Fill fuel compartment (see your 10).
6.
Open fuel shutoff cock and check for leaks
(see your 10).
7.
Connect battery negative lead (see your 20). 8.
Start personnel heater, and check personnel
9.
heater installation for proper operation and
leaks (see your 10).
Turn personnel heater OFF (see your 10).
Install power plant rear access panel
(see your -20).
Install rear floor plate (see your 20).
Raise and lock ramp (see your 10).
Stop engine (see your 10).