TM9-2350-261-34
86.
87.
88.
89.
90.
91.
Install harness (1) on wall of drivers com-
partment. Secure to three weldnuts (2) and
cradles (3) with three clamps (4), washers
(5), screws (6), and clips (7).
Install four connectors (8) on drivers bulk-
head. Secure with 16 nuts (9) and
screws (10). Have helper assist.
INSIDE DRIVERS
COMPARTMENT
On 200 amp generator system, install two
new grommets (11 and 12), circuit 2B lead
( 13), and circuit 2 lead (14) in distribution
box (15). Install circuit 2B lead and circuit
2 lead on bus bar (16). Secure with new
lockwasher (17) and screw (18).
On 100 amp generator system, install new
grommet (12) and circuit 2 lead (14) in dis-
tribution box (15). Install circuit 2 lead on
bus bar (16). Secure with new lockwasher
(17) and screw (18).
On 100 amp generator system, install new
grommet (19) and circuit 3 lead (20) in dis-
tribution box ( 15). Install circuit 3 lead on
circuit breaker (21). Secure with new
lockwasher (22) and screw (23).
Install new grommet (24) and circuit 6 lead
(25) in distribution box (15). Install circuit 6
lead on bus bar (16). Secure with new
lockwasher (26) and screw (27).
92. Install master switch panel assembly (2S)
on distribution box (15). Secure with eight
new locknuts (29), washers (30), and
screws (31).
FOR 200 AMP GENERATOR SYSTEM
FOR 100 AMP GENERATOR SYSTEM
GO TO NEXT PAGE
6 - 4 5