58.
59.
60.
61.
Install two bushings (1) on front of hull.
62.
Secure with two flat washers (2), four flat
washers (3), new lockwashers (4), and
nuts (5).
63.
Install six leads on front main wiring har-
ness (6) through two bushings (1) and
64.
bushings (7).
Install harness (6) on two bushings (7) and
65.
bushings (1). Secure with two retainers (8),
spring washers (9), and nuts (10).
Install six new terminals (11), insulators
(12), and connectors (13) on the ends of six
leads.
TM 9-2350-261-34
Connect circuit 514 and 515 leads (14 and
15) to left infrared service headlight (16).
Connect circuit 19 lead (17) to blackout
headlight (18).
Connect circuit 20 lead (19) to left blackout
marker light (20).
Connect circuit 17 and 18 leads (21 and 22)
to left service headlight (23).
GO TO NEXT PAGE
6-41