TM9-2350-261-34
49.
50.
51.
52.
Remove six terminals (l), insulators (2), and
connectors (3) from leads that were discon-
nected in steps 44 thru 47. Discard
terminals.
Remove two nuts (4), spring washers (5),
retainers (6), and bushings (7) from six
leads removed in steps 44 thru 47.
Pull these six leads on harness (8) through
two bushings (9).
Remove four nuts (10), lockwashers (11),
flat washers ( 12), two flat washers (13),
and bushings (9) from front of hull. Discard
lockwashers.
53.
54.
55.
Remove three cradle clips (14) from three
cradles (15) between distribution box (16)
and instrument panel (17).
Remove screw (18), clamp (19), and harness
(8) from weldnut (20) near panel.
Remove harness (8) from earner.
I N S T A L L
56.
57.
Install harness (8) on weldnut (20) near in-
strument panel (17). Secure with clamp (19)
and screw ( 18).
Install harness (8) on three cradles (15) be-
tween distribution box (16) and panel (17).
Secure with three clips (14).
6-40