9-2350-261-34
T M
81. From inside power plant compartment,
83. Inside drivers compartment, install front
connect right headlight wiring harness (l),
main wiring harness (6) on two cradles (7).
voltage regulator lead (2), and two power
Secure with two cradle clips (8).
plant harness leads (3) to drivers
compartment bulkhead.
N O T E
If voltage regulator was removed in step
25, do step 81. Otherwise. go to step 82.
84. Install voltage regulator (9) on four weld-
nuts (10). Secure with eight washers (11)
and four screws (12 ).
85. Connect two connectors
13) to regulator 9).
82. Inside drivers compartment, connect circuit
516A lead (4) to infrared power pack (5).
6 - 4 4