TM9-2350-261-34
105. Support instrument panel (1) on two
struts (2).
106. Install ground lead (3) and new lockwasher
(4) on upper support (5).
107. Install panel (1) with two mounts (6) on
upper support (5). Secure with two screws
(7) and flat washers (8).
108. Install panel on two struts (2). Secure with
two new locknuts (9), mounts (10 and 11),
flat washers (12), and screws (13).
F O L L O W - T H R O U G H S T E P S
1.
2.
3.
Install drivers power plant access cover
4.
(see your -20).
Close power plant front access door and raise
trim vane (see your 10).
5.
Connect battery ground lead (see your 20).
6.
Start engine (see your 10). Check that
master switch panel, instrument panel, and
distribution box work correctly.
Check that lights work correctly
(see your -10).
Stop/shutdown engine (see your -10).
END OF TASK
6-47