TM9-2350-261-34105. Support instrument panel (1) on twostruts (2).106. Install ground lead (3) and new lockwasher(4) on upper support (5).107. Install panel (1) with two mounts (6) onupper support (5). Secure with two screws(7) and flat washers (8).108. Install panel on two struts (2). Secure withtwo new locknuts (9), mounts (10 and 11),flat washers (12), and screws (13).F O L L O W - T H R O U G H S T E P S1.2.3.Install driver’s power plant access cover4.(see your -20).Close power plant front access door and raisetrim vane (see your –10).5.Connect battery ground lead (see your –20).6.Start engine (see your –10). Check thatmaster switch panel, instrument panel, anddistribution box work correctly.Check that lights work correctly(see your -10).Stop/shutdown engine (see your -10).END OF TASK6-47
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business