TM 9-2350-261-20-216. Install pin (1), washer (1.1) on bracketassembly (2). Secure with new cotter pin(3).17. Install tee (4) on bracket assembly (2).Secure with nut (5) and washer (6).18. Connect fuel line (7) to tee (4).19. Install throttle link (8) on bracket assembly(2). Secure with new locknut (9) andscrew (10).20. Install spring (11) and washer (12) onthrottle link (13). Insert throttle linkthrough pin (1) and secure with new cotterpin (14).21. Install governor throttle arm (15) ongovernor (16). Tighten screw (17).22. Install throttle link (13) on governor throttlearm (15). Secure with screw (18) and newlocknut (19).23. Adjust accelerator and transmission throttlevalve linkage (page 23-34).FOLLOW-THROUGH STEPSWARNINGLoose clothing is dangerousaround moving belts andpulleys. You could get in-jured if your clothes getcaught in moving parts.1. Start engine (see your -10). Check that upperaccelerator linkage operates properly.Stop/shutdown engine (see your -10).2. Install power plant rear access panel(page 24-27 or 24-29).3. Raise and lock ramp (see your -10).4. Stop/shutdown engine (see your -10).END OF TASKChange 4 23-32.1 (23-32.2 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business