TM 9-2350-261-20-2
REPLACE UPPER ACCELERATOR LINKAGE
DESCRIPTION
This task covers: Remove (page 23-31).
Install (page 23-32).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Screwdriver Set (Item 63, App D)
Socket Wrench Set (Item 89, App D)
Torque Wrench (Item 95, App D)
Materials/Parts:
Antiseize compound (Item 8, App C)
Grease (Item 18, App C)
Cotter pin (2)
Lockwasher (3)
Self-locking nut (3)
Personnel Required:
Unit Mechanic
References:
See your -10
See your LO
Equipment Conditions:
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Power plant rear access panel removed
(page 24-27 or 24-29)
REMOVE
5.
1.
2.
3.
4.
Remove locknut (1) and screw (2). Disconnect
throttle link (3) from governor throttle
arm (4). Discard locknut.
6.
7.
Loosen screw (5). Remove governor throttle
arm (4) from governor (6).
Remove cotter pin (7), washer (8), spring (9),
and throttle link (3) from pin (10). Discard
cotter pin.
Remove locknut (11) and screw (12).
Disconnect throttle link (13) from bracket
assembly (14). Discard locknut.
Disconnect fuel hose (15) from tee (16).
Remove nut (17) and washer (18) that secure
tee (16) to bracket assembly 04).
Remove cotter pin (19), washer (20) and pin
(10) from bracket assembly (14). Discard
cotter pin.
GO TO NEXT PAGE
Change 4
23-31