TM 9-2350-261-20-2 21. Connect three wiring harness connectors (1)to receptacles on driver’s compartment bulk-head.22. Install wiring harness (2) on transmissioncross–shaft bracket (3). Secure with twoclamps (4) and screws (5).FOLLOW-THROUGH STEPS 1.2.3.4.Adjust transmission cross-shaft linkage(page 23-34).Install hull bottom access cover(page 24-32). 6.Install air control valve (page 7-11).7.Install air cleaner housing and elementInstall driver’s power plant access panel(page 24-25).Close power plant tint access door and raisetrim vane (see your -10).Operate carrier (see your -10). Check thattransmission cross-shaft linkage operatesproperly.END OF TASK23-28(page 7-7).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business