TM 9-2350-261-20-2 INSTALLN O TEIf plug (11) was removed, clean and applya thin coat of sealing compound (Item 46)on threads before installing.5.6.7.8.Connect coolant tube (1) to hose (2) with twoclamps (3). Tighten two clamps (3).Connect coolant tube (1) and elbow (4) withhose (5) and two clamps (6). Tighten twoclamps (6).Apply a thin coat of sealing compound(Item 48) to both sides of new gasket (7).Install new gasket (7) between elbow (4) andengine. Secure with two flat washers (8), newlockwashers (9), and screws (10). Tightenscrews to 360-384 lb-in (41-43 N•m) torque.Use torque wrench.FOLLOW-THROUGH STEPS 1. Fill cooling system (page 8–5).3. Stop/shutdown engine (see your –10).2. Start engine (see your –10). Check for leaks.4. Close power plant front access door and raisetrim vane (see your -10).END OF TASK8-19
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business