TM 9-2350-261-20-2 INSTALL7. Secure insulation (1) to cooIant tube (2) withtwo clamps (3).8. Secure bracket (4) to bulkhead with screw(5), washer (6) and new locknut (7).9.10.11.Place clamp (8) on coolant tube (2). Secureclamp to bracket (4) with screw (9), washer(10) and new locknut (11).Secure hose (12) to radiator inlet elbow (13)and coolant tube (2) with two clamps (14).Secure hose (15) to coolant tube (2) anddeaeration elbow (16) with two clamps (17).FOLLOW-THROUGH STEPS 1. Fill cooling system (page 8-5).5.2. Start engine (see your-10). Check for leaks.6.3. Stop/shutdown engine (see your -10).Install power plant rear access panel(page 24-27 or 24-29).Close power plant front access door and raisetrim vane (see your –10).4. Install driver’s power plant access panel(page 24-25).END OF TASK8-13
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business