TM 9-2350-261-20-2
R E P L A C E D E A E R A T I O N E L B O W T O R A D I A T O R I N L E T E L B O W
C O O L A N T T U B E
DESCRIPTION
This task covers:
Remove (page 8-12).
Install (page 813).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Materials/Parts:
Self-locking nut
Self-locking nut
Personnel Required:
Unit Mechanic
References:
See your -10
Equipment Conditions:
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Trim vane lowered and power plant front
access door open (see your -10)
Drivers power plant access panel removed
(page 24-25)
Power plant rear access panel removed
(page 24-27 or 24-29)
Cooling system completely drained (page 83)
REMOVE
4.
1.
2.
3.
Remove two clamps (1) and hose (2) from
deaeration elbow (3) and coolant tube (4).
5.
Remove two clamps (5) and hose (6) from
coolant tube (4) and radiator elbow (7).
6.
Remove locknut (8), washer (9), screw (10),
clamp (11) and coolant tube (4) from bracket
(12). Discard locknut.
Remove coolant tube (4) through power plant
rear access panel opening.
Remove clamp (11), two clamps (13) and in-
sulation (14) from coolant tube (4).
Remove screw (15), washer (16), locknut (17)
and bracket (12) from power plant
compartment bulkhead. Discard locknut.
8-12