TM 9-2350-261-20-2 R E P L A C E E N G I N E C O O L A N T P U M PINITIAL SETUP Personnel Required: Unit MechanicTools:General Mechanics Tool Kit (Item 30, App D)References:See your -10Materials/Parts:Sealing compound (Item 47, App C)Equipment Conditions: GasketPower plant removed from carrier (page 5-11)Lockwasher (4)REMOVE1.2.3.Remove coolant pump drive belts (page 8-9).Loosen two clamps (1) and slide bypasshose (2) upward on thermostat tube (3).Remove four cap screws (4), four washers (5),four lockwashers (6) one socket head screw(7), wiring harness bracket (8), coolant pump(9) and gasket (10) from oil cooler housing.Discard gasket and lockwashers.INSTALL4.5.6.7.Apply sealing compound to new gasket (10).Secure gasket, coolant pump (9), andbracket (8) to oil cooler housing with onesocket head screw (7), four washers (5), fournew lockwashers (6) and cap screws (4).Secure bypass hose (2) to thermostat tube (3)and coolant pump (9) with two clamps (1).Install coolant pump drive belts (page 8-9).Adjust coolant drive belts (page 8-9).FOLLOW-THROUGH STEPS 1. Install power plant assembly in earner (page3. Stop/shutdown engine (see your -10).5-11). Leave power plant access door open.4. Close power plant front access door2. Start engine (see your -10). Check for leaks(see your -10).around water pump and bypass hose.END OF TASK8-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business