TM 9-2350-261-20-2108.109.110.Install harness (1) in three cradles (2) and111. Connectsecure with three clips (3).(10, 11,harnessInstall clamp (4) on harness (1) withscrew (5) and new locknut (6).112. Connectpump (19).Secure clamp (4) to floor beam (7) withtwo screws (8) and new locknuts (9).circuit 21, 22, 23, and 24 leads12, and 13) to trailer wiringleads (14, 15, 16, and 17).circuit 451 lead (18) to rear bilge12-118.18Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business