106.107.108.Install circuits 59 and 37B leads (1 and 2)109.and two grommets (3) in master switchpanel (4).110.Connect circuit 37B lead (2) to blowerswitch (5) and circuit breaker (6).Connect circuit 59 lead (1) to blowerTM 9-2350-261-20-2Connect wiring harness ( 7 ) to circuit 38Elead (8).Connect wiring harness (9) to circuit 10 onthree circuit breakers (10, 11, and 12) inmaster switch panel (4).N O T Eswitch (5).Inspect gasket (17). Replace if damaged.111. Install master switch panel (4) ondistribution box ( 13),screws (14), washerslocknuts (16).Secure with eight(15), and newGO TO NEXT PAGE12-97
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business