TM 9-2350-261-20-2R E P L A C E S T A R T E R G R O U N D L E A D SDESCRIPTIONThis task covers:Remove (page 10-4).Clean, Inspect, and Replace (page 10-5).Install (page 10-5).INITIAL SETUPTools:References:General Mechanics Tool Kit (Item 30, App D)see your -loMaterials/Parts:Equipment Conditions:Leads, as requiredEngine stopped/shutdown (see your -10)Self-locking nutCarrier blocked (see your -10)Trim vane lowered (see your -10)Personnel Required:Power plant front access door openUnit Mechanic(see your -lo)Battery ground leads disconnected (page 13-2)REMOVE1.2.3.Remove nut (1), washer (2), short groundlead (3), and long ground lead (4) fromstarter (5).N O T ESome earner hull grounds may have starwashers. Discard star washers andassemble ground leads with flat washersas instructed in the installation steps.Remove screw (6), washer (7), and short lead(3) from engine block. Remove lead fromearner.Remove locknut (8), long lead (4), twowashers (9), and screw (10) from hull mount.Remove lead from carrier. Discard locknut.10-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business