TM 9-2350-261-20-2R E P L A C E G E N E R A T O R A N D A D J U S T M E N T L I N K A GE( 1 0 0 A M P G E N E R A T O R O N L Y)DESCRIPTIONThis task covers:Remove (page 9-3 1).Install (page 9-32).INITIAL SETUPTools:General Mechanics Tool Kit (Item 30, App D)Socket Wrench Set (Item 89, App D)Torque Wrench (Item 94, App D)Materials/Parts:Antiseize compound (Item 4, App C)Key washer (2)LockwasherSelf-locking nut (6)Self-locking nut (2)Personnel Required:Unit MechanicReferences:see your -loEquipment Conditions:Engine stopped/shutdown (see your –10)Carrier blocked (see your -10)Battery ground lead disconnected (page 13-2)Power plant rear access panels and support.-removed (page 24-27) -Generator drive belts removed (page 9-29)REMOVE1.2.3.4.5.Discomect cable (1) from generator (2).Remove locknut (3), screw (4), rod end (5),and spacer (6) from generator (2). Discardlocknut.Remove locknut (7), screw (8), rod end (9),and spacer (10) from bracket (11). Discardlocknut.Remove two rod ends (5 and 9) from turn-buckle (12). Remove jam nut (13) from rodend (9).Remove three screws (14), two key washers(15), lockwasher (16), flat washer (17), andbracket (11) from transfer gearcase. Discardkey washers and lockwasher.GO TO NEXT PAGE9-31
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business