INSTALL24.25.26.27.28.29.30.31.Apply a thin, even coat of sealing compoundto cleaned external pipe threads on fittings.Install nipple (1) in power plantcompartment bulkhead. Secure with jamnut.InstallInstallInstalltube (2) on nipple (1).elbow (3) on tube (2).quick-disconnect coupling half (4) onelbow (3).Connect quick-disconnect coupling (4 and 5).Connect hose assembly (6) to nipple (1).Install hoseSecure withassembly (6) on weldnuts (7).five clamps (8) and screws (9).32.33.34.35.TM 9-2350-261-20-1Install nipple (10) in tube (11).Install shutoff valve (12) on nipple (10 witharrow pointing toward front of carrier.Install adapter (13) in shutoff valve (12).Connect hose assembly (6) to adapter (13).GO TO NEXT PAGE6-63
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business