TM 9-2350-261-20-1
26. Remove four clamps (1) and two hoses (2)
from deaeration elbow (3) and tube (4).
30. From underneath carrier, disconnect
(12) from differential oil pump (13).
27.
28.
29.
.
Remove four clamps (5) and two hoses (6)
from oil cooler elbow (7) and tube (8).
Remove tubes (4 and 8) through power
plant front access door opening.
Remove two clamps (9) and hose (10) from
oil cooler elbow (7) and vent tube (11).
hose
lifted for
WARNING
Hanging loads can kill or
injure you. Keep away from
hanging loads and over-
head equipment.
Keep
hands out of compartment
while power plant is being
r e m o v a l o r l o w e r e d f or
installation.
31. Remove power plant from carrier. Have
helper assist.
5-16