TM 9-2350-261-20-1
I N S T A LL
7. Connect two tubs assemblies (1 and 2) to
two elbows (3 and 4).
8. Install two hose clamps (5 and 6) on two
drain hoses (7 and 8).
9.
10.
11.
12.
Connect two drain hoses (7 and 8) to two
tube assemblies (1 and 2).
Tighten two hose clamps (5 and 6) on two
drain hoses (7 and 8).
Install two drain hoses (7 and 8) on con-
tainer bracket (9).
Install two drain hoses (7 and 8) in engine
block. Secure with three screws (10), two
washers (11), and three clamps (12).
Tighten screws to 180-216 lb-in torque. Use
torque wrench and socket set.
NOTE
If elbows 3 and 4 need to be replaced,
notify direct support maintenance.
FOLLOW-THROUGH STEPS
1. Install starter (page 10-2).
2. Install power plant (page 5-11).
END OF TASK
4-10
Change 4