TM 9-2350-261-20-1
R E P L A C E O I L G A G E R O D A N D G U I DE
INITIAL SETUP
Tools:
Equipment Conditions:
General Mechanics Tool Kit (Item 30, App D)
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Materials/Parts:
Drivers compartment access panel removed
Sealing compound (Item 52, App C)
(see your -10)
Self-locking nut
Power plant rear access panel removed
(see your -10)
Personnel Required:
Unit Mechanic
Power- plant bottom access cover removed
(page 24-32)
References:
see your -10
REMOVE
1. Remove gage rod (1) from gage rod guide (2).
2. Remove lock nut (3), screw (4), washer (5),
clamp (6), and gage rod guide (2) from
bracket (7). Discard locknut.
3. Remove gage rod guide (2) from adapter (8).
4. Remove adapter (8) from engine block.
NOTE
Plug or cover engine block opening to
prevent dirt or debris from entering
engine.
INSTALL
5.
6.
7.
Apply a thin coat of sealing compound to ex-
ternal threads of adapter (8).
Install adapter (8) in engine block.
Install gage rod guide (2) in adapter (8).
8.
9.
Install gage rod guide (2) on bracket (7).
Secure with clamp (6), screw (4), washer (5),
and new locknut (3).
Install gage rod (1) in gage rod guide (2).
FOLLOW-THROUGH STEPS
1. Install drivers compartment access panel
3. Install power plant bottom access cover
(see your -10).
(page 24-32).
2. Install power plant access panel
(see your -10),
END OF TASK
4-15 (4-16 blank)
![](//www.tpub.com/assessment.jpg)