TM 9-2350-287-20-13-6 OIL COOLER HOSES REPLACEMENT (continued).b.1.2.3.4.5.6.7.INSTALLATIONlnstalI two split flange halves(3), newpreformedpacking (4), and hose (14) on rear of engine oilcooler (5).Install four screws (1 ) and new lockwashers (2)on two split flange halves (3).Install two split flange halves (7), new preformedpacking (6), and hose (8) on front of engine oilcooler (5).Install four screws (9) and new Iockwashers(10) on two split flange halves (7).Install two hoses (8 and 14) on elbows (13) ontwo oil filter covers (12).Install two drain plugs (11) on two oil fitlercovers (12).Add engine oil (refer to Appendix G).• Install transmission oil cooler hose assembly (para 8-5).• Install engine coolant tube assembly (para 6-10).• Install bypass thermostat and housing assembly (para 6-12).• Install engine coolant manifold connector housing (para 6-11).• Install powerpack (para 3-2).FOLLOW-ON TASKS:3-40
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business