Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-5_58
INSTALLATION - TM-9-2350-277-20-5_60
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
17
18
19
20
21
22
23
24
25
26
27
TM 9-2350-277-20-5
REPLACE FRONT BILGE VALVE
0633 00
THIS WORK PACKAGE COVERS:
Removal (page 0633 00-1).
Installation (page 0633 00-2).
INITIAL SETUP:
M
aintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Locknut (3)
Personnel Required
Unit Mechanic
R
eferences
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Driver’s rear floor plate removed (WP 0453 00)
Personnel heater floor duct removed (WP 0706 00)
Left front floor plate removed (WP 0539 00)
REMOVAL
1.
Remove three locknuts (1), six washers (2), and three screws (3) from hull cross beam. Discard locknuts.
2.
Remove valve
(4) from beam.
0633 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business