TM 9-2350-277-20-5REPAIR PERSONNEL HEATER CONTROL BOX 0702 00THIS WORK PACKAGE COVERS:Disassembly (page 0702 00-1).Repair or replacement (page 0702 00-4).Assembly (page 0702 00-5).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Multimeter (WP 0926 00, Item 30)Materials/PartsLockwasher (9)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionHeater control box removed (WP 0701 00)DISASSEMBLYNOTETag all electrical leads before removing.1. Remove circuit breaker (7) from control box (12).a. Remove two screws (1), lockwashers (2), lead 16 (3) from one terminal, and lead 17-D (4), lead 17-3 (5), andjumper 15-17 (6) from other terminal on circuit breaker (7).b. Remove two nuts (8), four lockwashers (9), ground lead (10), two screws (11), and circuit breaker (7) from controlbox (12). Discard lockwashers.0702 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business