TM 9-2350-277-20-5REPLACE PERSONNEL HEATER CONTROL BOX 0701 00THIS WORK PACKAGE COVERS:Removal (page 0701 00-1).Installation (page 0701 00-3).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Materials/PartsLockwasher (2)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Battery ground strap disconnected (WP 0337 00),(WP 0338 00), or (WP 0339 00)REMOVAL1. Disconnect circuit 400 lead (1) from heater control box lead (2).2. Disconnect heater wiring harness (3) from heater control box (4).3. Remove two screws (5) and control box (4) from control box case (6).0701 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business