TM 9-2350-277-20-4
REPLACE MISSILE RACK (M901A3 ONLY) Continued
0588 00
10. TIGHTEN TWO SCREWS (17) TO 216-264 LB-IN (24-30 N m) TORQUE.
11. Install two brackets (14) on lower rack (7). Secure with two washers (18), screws (19), washers (20), and nuts (21).
12. TIGHTEN TWO SCREWS (19) TO 216-264 LB-IN (24-30 N m) TORQUE.
13. Install middle rack (8) and upper rack (9) on carrier. If removed, secure with 16 flanged bushings (11), 8 shim washers
(12), 4 headed straight pins (10), and 4 new cotter pins (13). Use shim washers (12) as required at missile clevis points to
ensure no more than 0.002-inch end movement.
14. Adjust latches (22) for positive overcenter locking action.
15. TIGHTEN LATCH SECURING SCREWS (23) TO 84-108 LB-IN (10-12 N m) TORQUE.
FOLLOW-THROUGH STEPS
1.
Start engine (see your -10).
2.
Raise and lock ramp (see your -10).
3.
Stop engine (see your -10).
END OF TASK
0588 00-5/6 blank