Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-4_550
REMOVAL - TM-9-2350-277-20-4_552
TM-9-2350-277-20-4 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
450
451
452
453
454
455
456
457
458
459
460
TM 9-2350-277-20-4
REPLACE FLOOR PLATES (M981A3 ONLY)
0541 00
THIS WORK PACKAGE COVERS:
Removal (page 0541 00-1).
Disassembly (page 0541 00-4).
Assembly (page 0541 00-4).
Install (page 0541 00-5).
INITIAL SETUP:
Maintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Adhesive (WP 0928 00, Item 8)
Wiping rag (WP 0928 00, Item 65)
Grommet
Lockwasher (4)
Lockwasher (13)
P
ersonnel
Required
Unit Mechanic
R
eferences
See your -10
Equipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Launcher stowed (see your -10)
Radio operator’s seat removed (WP 0568 00)
REMOVAL
1.
Remove three screws (1) washers (2) from heater duct (3) and floor assemblies (4) and (5).
2.
Remove nine screws (6),
lockwashers
(7) washers (8), and cable protector (9). Discard lockwashers.
3.
Remove six bolts (10), washers (11), and two access covers (12) from platform assembly (13)
0541 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business