TM 9-2350-261-34I T E MREMARKSFor level A deprocessing, perform the following procedures in addition to all the procedures for levelB deprocessingSERVICE UPON RECEIPT - M113A2LOCATIONACTIONHullFuel systemFill fuel tankHullSquad seats and back-Remove shipping paper and tape.restsHullHullCommander's seat and Install commander's seat and post onpostcarrier. See TM 9-2350-261-20.Periscopesa.Remove plugs from periscopeopenings.b.Remove periscopes from packagesand install. See TM 9-2350-261-20.HullHullHullHullFire ExtinguishersCheck for intact seals on handles.Drain plugsClose hull drain plugs.Closure kitRemove and store closure kit.Engine air inlet grillRemove shipping tape and intake andexhaust grill cover from exhaust andintake grill.HullArmor mounting inserts Check for loose or missing plugs in in-and screw holesserts and setscrews in hull screw holes.LEVEL APower Plant EngineCompartmentChange engine oil. See engine crank-case tag on filler neck andLO 9-2350-261-12.Power PlantTransmissionService transmission with operationalCompartmentlubricant. See transmission tag on filler necks and LO 9-2350-261-12.HullFinal drivesService final drives with operational lu-bricant. see Lo 9-2350-261-12.CHECKING EQUIPMENTPerform all operator and organizational PMCS. See TM 9-2350-261-10 and TM 9-2350-261-20.Inspect the equipment for damage incurred during shipment. If the equipment has been damageddamage on form SF 368, Quality Deficiency Report.2-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business