TM 9-2350-261-34
35.
36.
Position wiring harness (1)
and connect rear connector
connector (3).
Install four wiring harness
37.
38.
on transmission
(2) and front
brackets (4) on
transmission. Secure with four screws (5)
and washers (6). Tighten screws to 13-15
ft-lb (18-20 N·m) torque.
Install variable speed drive clutch supply
hose elbow (7) on transmission falter
case (8).
Install variable speed return hose elbow (9)
on transmission end cover (10).
39.
40.
41.
42.
ISecure adapter (11) and new gasket (12) to
transmission with four screws (13). Tighten
four screws to 27-32 lb-ft (36-44 N·m)
torque.
Install tow start control lever (14) and
bracket (15) on transmission. Secure with
two screws (16) and washers (17).
Install elbow (18) on transmission. Tighten
jam nut (19).
Install oil outlet hose (20) on elbow (18). Do
not tighten.
8-8