TM 9-2350-261-34
NOTE
Lubricate rod end bearings before assem-
bling. Use GM grease (see your LO).
77.
77.1
77.2
77.3
Apply thin coat of antiseize compound to
clean threads of three screws (1, 2).
Install bracket assembly (3) on power
plant. Secure with two screws (1), new
lockwashers (4), and nuts (5). Tighten
screws to 300-324 lb-in (34-37 N.m)
torque. Use torque wrench and socket
wrench set.
Install screw (2) and new lockwasher (6)
bottom hole of bracket assembly (3).
Tighten screw to 264-288 lb-in (30-33
in
N.m) torque. Use torque wrench and socket
wrench set.
Position inner transfer shaft (7) and outer
transfer shaft (8) in bracket assembly (3).
Secure with screw (9) and new locknut
(10). Use cross-tip screwdriver.
78.
79.
80.
81.
82.
Attach gage (11) to governor (12) in
adjusting position. Secure with two screws
(13). Align hole in throttle arm (14) with
hole in gage. Secure throttle arm.
Remove two screws (13) and gage (11) from
governor (12). Install gage in operating posi-
tion on governor. Secure with two screws.
Install governor control link (15) on throttle
arm (14) with screw (16) and nut (17).
Connect elbow (18) to tee (19).
Connect air box heater fuel supply hose (20)
to tee (19).
GO TO NEXT PAGE
Change 1
3-43