TM 9-2350-261-34
103.
104.
105.
106.
Install ground lead ( 1 ) on engine block.
Secure with new lockwasher (2) and
screw (3).
Install two ground leads (1and 4) on
starter (5). Secure with new Iockwasher (6)
and nut (7).
Install two new lockwashers (8) (Delco and
Leece Neville only) and circuit 74A lead (9)
on terminal of starter solenoid ( 10). Secure
with nut (11) ( screw on Prestolite).
Install circuit 6 lead ( 12) on terminal of
starter solenoid ( 10). Secure with new
lockwasher (13) and nut (14).
107. Connect power plant wiring harness circuits
1A and 1B lead (15) to field switch ( 16) at
secondary fuel filter ( 17).
3-48