TM 9-2350-261-34103.104.105.106.Install ground lead ( 1 ) on engine block.Secure with new lockwasher (2) andscrew (3).Install two ground leads (1and 4) onstarter (5). Secure with new Iockwasher (6)and nut (7).Install two new lockwashers (8) (Delco andLeece Neville only) and circuit 74A lead (9)on terminal of starter solenoid ( 10). Securewith nut (11) ( screw on Prestolite).Install circuit 6 lead ( 12) on terminal ofstarter solenoid ( 10). Secure with newlockwasher (13) and nut (14).107. Connect power plant wiring harness circuits1A and 1B lead (15) to field switch ( 16) atsecondary fuel filter ( 17).3-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business