TM 9-2350-261-34
WARNING
Engine is heavy. Use a lift-
ing device. Have helper (H)
assist.
51.
52.
Use a lifting device of at least 2000 lb
(908 kg) capacity and sling (1) to lift
engine.
Remove two screws (2), key washers (3),
cap (4), base (5), and rubber engine mount
(6) from support (7). Discard key washers.
N O TE
Remove and retain trunnion mounts for
M 1 2 5 A 2 , M 1 0 6 4 , a n d M 1 0 6 A 2
engines only.
53. Remove eight screws (8), washers
trunnion mount (10) from engine.
carrier
(9), and
I N S T A LL
54. Use a lifting device of at least 2000 lb
(908 kg) capacity and sling (1) to lift new
engine from shipping container. Block rear
end of engine on level ground (page 32).
CAUTION
Parts installed in steps 56 thru 118 are not
supplied with new engine. These parts
must be retained from the old engine.
NOTE
Install retained trunnion mounts for
M 1 2 5 A 2 , M 1 0 6 4 , a n d M 1 0 6 A 1 c a r r i e r
engines only.
55.
56.
57.
Apply a thin coat of antiseize compound to
cleaned threads of two screws (2).
Install trunnion mount (10) on engine.
Secure with eight screws (8) and washers
(9). Tighten screws to 55-60 lb (75-81
N.m) torque. Use torque wrench (item 105).
Install base (5), rubber engine mount (6)
and cap (4) on support (7). Secure with two
screws (2) and new key washers (3).
Tighten screws to 360-420 in-lb (41-47
N-m) torque. Use torque wrench (item 110).
Block front of engine mount (page 32) with
Wood blocks.
3-40
Change 2
5
8 .
