TM 9-2350-261-34Apply a thin coat of antiseize compound tocleaned t breads of two screws ( 1 ).Install cross–shaft bracket (2) ontransmission. Secure with two screws ( 1 )and new key washers (3).Apply a thin, even coat of primer and thensealing compound to cleaned external threadsof vent tube elbow (4). Do not apply primeror sealing compound beyond small end ofthreads.10. Install vent tube elbow (4) in transmission.11. Connect vent tube (5) to vent tubeelbow ( 4 ) .12.13.14.15.Apply a thin, even coat of primer and thensealing compound to cleaned external threadsof elbows (6). Do not apply primer orsealing compound beyond small end ofthreads.Install two new packings (7) and elbows (6)in transmission.Position range selector arm (8) on transmis-sion shaft (9) with offset side of arm towardtransmission and clamping screw holealigned with flat on shaft. Secure withscrew (10) and nut (11).Position throttle valve arm (12) on trans-mission shaft ( 9 ) with offset side of armaway from transmission and clamping screwhole aligned with flat on shaft. Secure withscrew ( 13) and new locknut ( 14).FOLLOW-THROUGH STEPS1. Install transmission on transfer gearcase2. Install power plant in carrier (see your –20).(page 3-4 ).3. Fill transmission (see your LO).END OF TASK3-15I N S T A L L7.8.9 .
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business